RELIABLE WATER PIPELINE CONSTRUCTION

MORE SUPPLY SECURITY

Water management worldwide faces the constant challenge of securing the supply of high-quality drinking water and adapting the capacities of the pipeline network to the constantly growing demand. In order to ensure this, while keeping costs for utilities and consumers as low as possible, trenchless technologies offer sustainable and reliable solutions.

PROFITABLE PIPELINE NETWORKS

With our NODIG systems, you can build and maintain your water supply network in a profitable and environmentally friendly way, in existing complex infrastructures as well as in areas where development in open construction is neither ecologically nor economically reasonable. Every requirement can be satisfied reliably, from the installation of pressure pipes for water transport and distribution to the manufacture of house connections to the final consumer and the sustainable renewal of damaged water pipes.

AT A GLANCE

  • Reliable installation of water pipes along roads and under traffic and waterways with short or long pipes made of all standard materials
  • Underground construction of water house connections from the building or directly from the connection room to the main pipe or in the opposite direction
  • Trenchless renewal of irreparably damaged transport pipelines and house connections by the replacement with new pipes in the existing route in order to avoid water losses in the long term
  • Trenchless pipe renewal enables the sustained prevention of leaks while simultaneously adapting the pipe capacity by 1–2 nominal widths
  • Reliable and accurate technology, reliable and proven application

New pipe installation

Parallel bores

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
32–710 mm
Pipe materials:
PE, PP, steel, cast iron
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
32–710 mm
Pipe materials:
PE, PP, steel, cast iron
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, PP, steel, cast iron
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Crossings underneath traffic ways

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, steel, cast iron
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

House connection technology

Pit–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, PP, steel, cast iron
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Pit to Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, PP, steel, cast iron
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Keyhole–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 60 m
Pipe diameter:
Up to 90 mm
Pipe materials:
PE (short and long pipes)
Soil classes:
1–5
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Pit to Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Basement–Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, PP, steel, cast iron
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Basement–Pit

Method:
Non-steerable soil displacement method
Bore length:
25 m
Pipe diameter:
160 mm
Pipe materials:
PE, PVC (short and long pipes)
Soil classes:
1–5
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Basement–Keyhole

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Pipe renewal

Installation of pipes with smaller, equal or larger diameter

Method:
Static pipe bursting
Bore length:
Max. 300 m
Pipe diameter:
50–1,200 mm
Pipe materials old pipe:
Grey cast iron, ductile cast iron, asbestos cement, fibre cement, PE/PP, PVC, glass fibre reinforced plastics (GRP), steel, liner
Pipe materials new pipe:
PE/PP, PVC, glass fibre reinforced plastics (GRP), ductile cast iron, steel
Soil classes:
Old pipes passable for bursting rods
Our suitable NODIG-System for your application:
GRUNDOBURST - Static pipe bursting systems
Find out more

DO YOU HAVE ANY QUESTIONS?

WE WILL BE GLAD TO HELP YOU!

You can reach us by phone

Call

 

E-Mail
Contact

Do you have any product or
services related questions?

Please contact us:

+61 7 3420 5455

SEND E-MAIL