We use cookies on different pages to make visits of our website attractive and enable use of certain functions. These are small text files stored on your computer. Most of the cookies we use are deleted again from your hard disk after the end of your browser session (so-called session cookies). Other cookies will remain on your computer and make it possible for us to recognise your computer again at your next visit (so-called permanent cookies). Our partner companies have no right to collect personal information via cookies through our website, to process or use them.
X

PROFESSIONAL NATURAL GAS DISTRIBUTION NETWORKS

PROFESSIONALLY NETWORKED

Well developed natural gas distribution networks play an important role in the success of the energy transition. In order for the pipeline network to be able to transport and store sufficient quantities of fossil and increasingly renewable natural gas, high investments are required for the maintenance and expansion of the infrastructure. These expenses can be significantly reduced with trenchless technologies in an environmentally friendly way and expansion can be accelerated without compromising supply quality and security.

A QUESTION OF SAFETY

Whether pipelines for feeding natural gas produced worldwide into national networks, pressure pipelines for transport and distribution, pipelines for storing synthetic gas from the overproduction of green electricity or the connection of service lines to the end consumer, all these pipelines can be installed and even renewed without trenches using our NODIG processes – safely and professionally according to the latest technical standards.

AT A GLANCE

  • Professional installation of protection and product pipes along roads and under traffic and waterways with short or long pipes made of all standard materials
  • Trenchless construction of gas house connections from the pit/keyhole to the building or directly into the supply room and vice versa
  • The minimally invasive keyhole technology was developed especially for the serial installation and renewal of gas house connections, it really couldn‘t be more gentle and economical
  • Trenchless renewal of damaged gas pipelines and house connections by the replacement with new pipes in the existing route (pipe bursting) enables the sustained prevention of leaks while simultaneously adapting the pipe capacity by 1–2 nominal widths
  • Maximum planning and technical safety while maintaining the latest regulations
  • Precise proof and documentation of position, function and tightness of the new pipelines

New pipe installation

Parallel bores

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
32–710 mm
Pipe materials:
PE, steel (media or protection pipes)
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
63–710 mm
Pipe materials:
PE, steel (media or protection pipes)
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel (media or protection pipes)
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Crossings underneath traffic ways

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

House connection technology

Pit to Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE (protection pipes), single pipes and pipe bundles
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Pit–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE (protection pipes), single pipes and pipe bundles
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Keyhole–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 60 m
Pipe diameter:
Up to 90 mm
Pipe materials:
PE (short and long pipes)
Soil classes:
1–5
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Pit to Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Basement–Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE (protection pipes), single pipes and pipe bundles
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Fluid-assisted mini drill rigs
Find out more

Basement–Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Pipe renewal

Renewal of natural gas pipelines

Method:
Dynamic pipe bursting
Bore length:
Max. 300 m
Pipe diameter:
Up to 508 mm
Pipe materials old pipe:
Stoneware, concrete, stoneware-concrete, GG, PVC, AC/FC
Pipe materials new pipe:
PE/PP, steel, PVC
Soil classes:
Old pipes passable for winch rope
Our suitable NODIG-System for your application:
GRUNDOCRACK - Dynamic pipe bursting systems
Find out more

Installation of pipes with smaller, equal or larger diameter

Method:
Static pipe bursting
Bore length:
Max. 300 m
Pipe diameter:
50–1,200 mm
Pipe materials old pipe:
Stoneware, concrete, stoneware-concrete, steel, grey cast iron, PE/PP, PVC, GRP, AC/FC, liner
Pipe materials new pipe:
PE/PP, steel, PVC, grey cast iron, stoneware, PC, stoneware-concrete
Soil classes:
Old pipes passable for bursting rods
Our suitable NODIG-System for your application:
GRUNDOBURST - Static pipe bursting systems
Find out more

DO YOU HAVE ANY QUESTIONS?

WE WILL BE GLAD TO HELP YOU!

You can reach us by phone

Call

 

E-Mail
Contact

Do you have any product or
services related questions?

Please contact us:

+61 7 3420 5455

SEND E-MAIL