Use of Cookies
By continuing your visit on our website, you consent to the use of cookies.
Further information
Close

We use cookies on different pages to make visits of our website attractive and enable use of certain functions. These are small text files stored on your computer. Most of the cookies we use are deleted again from your hard disk after the end of your browser session (so-called session cookies). Other cookies will remain on your computer and make it possible for us to recognise your computer again at your next visit (so-called permanent cookies). Our partner companies have no right to collect personal information via cookies through our website, to process or use them.
INSPIRING TRENCHLESS TECHNOLOGIES

menuImage
 
Business areas:
Nodig-Systeme
Pipe Bending Systems

TT Group Companies
Int. Sales Partners


If there is no TT representation in your country, please contact the TT headquarters at export@tracto-technik.de or phone +49 2723 808-0
Menu
 

GRUNDOBURST - Pipe renewal at its best



GRUNDOBURST rigs are perfectly equipped for pipe renewal using the static pipe bursting method. With the powerful and robust pulling rigs, damaged old pipes with diameters up to 1,200 mm (circular and oval profiles) can be renewed without the need for trenches. Pipe bursting is an acknowledged and most important, sustainable method for renewing pressure and gravity gradient lines; it has been in use all over the world for the past 30 years. Old pipes (VCP, lead, PVC, PE, grey cast iron, ductile iron, AC,GFRP, steel etc.) are replaced by new pipes (PE, PP, VCP, ductile cast iron, GFRP, steel, PVC etc.) with identical, smaller or larger diameter pipes.

THE ADVANTAGES

  • Can be used for almost any types of damage and any kind of old pipe materials
  • Long service life for the new pipe, 80 - 100 years
  • The old pipe capacity can be scaled up by 1 - 2 nominal sizes
  • QuickLock: simple and safe rod connections - engage with a click, no screwing together;
  • even small bend radii can be accessed
  • Fast installation and set-up times
  • Renewal of already existing pipe-line routes
  • 40 % cost saving in comparison with open trench methods
  • Minimal disruption to the environment and traffic flow  
  • Almost no re-instatement costs due to ground settlement, groundwater interference
  • No road damage after pipe bursting
  • Safe application according to latest rules and standards

GRUNDOBURST SERIES - MODELS

GRUNDOBURST400S GRUNDOBURST400G GRUNDOBURST800G
GRUNDOBURST1250G GRUNDOBURST1900G GRUNDOBURST2500G
  •  
  • Compact dimensions for small pits
  • Can be applied in both directions - from a single pit
  • Rapid working cycles and high performance
  • Quick rod thrust and pipe pulling of the new pipe into the old
  • Fast machine start
  • All machine types have remote control
  • Light weight for simple transportation
  • Accessories for specific methods
  • Stable and job-site specific construction for increased demands
  • Long service life and minimal maintenance requirements
  • Ergonomic operation and all-round working safety
  • CE certification


Further information


.



Contact

Contact


TRACTO-TECHNIK Australia Pty Ltd.
Unit 2, Devlan Street
Mansfield, Qld 4122
Australia

Phone: +61 (0)7 3420 5455
Fax: +61 (0)7 3420 5855
E-Mail: info@tracto-technik.com.au